SAMSHIN
01
Release For Material
02
Cutting
03
Chemical Analysis USM Material
04
Forging05
Heat Treatment Check calibration and compliance with procedures
06
Mechanical Properties Test Test whether material code requirements are met
07
Heat treatment after welding Check calibration and compliance with procedures
08
Finish Maching
09
Dimension Inspection
10
Wall Thickness Measurement
11
Seal Welding(Body+Seat Ring)
12
NDE(Weld PT)
13
Assembly
14
SEAL WELDING (Body + Bonnet)
15
NDE(Weld PT)
16
Hydrostatic Shell Test
17
Seat Leakage Test Test by ASME B 16.34
18
Functional Test
19
Surface Preparation For Coating
20
Cleaning
21
Coating Application & Inspection Test by coating condition and procedures
22
Final Inspection Check accessories, nameplates, tags,etc.
23
Packing Inspection Test by procedures
24
Release For Shipment